BETA

You're viewing an updated version of this site - your feedback will help us to improve it.

report, Document

Awel y Grug Project Update - April 2024

Awel y Grug

First published: 23 March 2026
Last updated: 23 March 2026
Download document: 32.69 KB, PDF

This file may not be fully accessible.

Although no data was collected regarding DLWGs in 2023, Chris noted that he has been impressed by the condition gained by the lambs in the short time they grazed plot A, and lambs grazing Plot B also improved condition quickly compared to permanent pasture. 

The field was then rested over the housing period between January and April 2024 before being grazed by ewes and lambs at turn-out, again carefully leaving higher residuals due to soggy ground conditions. No concentrates were fed to ewes after turn-out; a significant cost saving for Awel y Grug.

Download document: 32.69 KB, PDF

This file may not be fully accessible.


Business Wales Helpline

03456 000 813

Lines are open 10am to 4pm Monday to Friday.

Rydym yn croesawu galwadau'n Gymraeg.