BETA

You're viewing an updated version of this site - your feedback will help us to improve it.

report, Document

Awel y Grug Project update - September 2023

Awel y Grug

First published: 23 March 2026
Last updated: 23 March 2026
Download document: 67.69 KB, PDF

This file may not be fully accessible.

During a challenging establishment year in 2023, where many grass reseeds have struggled, both plots sown for this project established well, although a prolonged period of rain between field preparation (17 July) and sowing (17 August) meant that some weeds, including creeping buttercup, chickweed and meadow grasses are present in both leys. The plots are detailed below: 

Figure 1. Map of fields involved in trial at Awel y Grug

Table 1. Plots A1 + A2 - Aber HSG2 Early Cut + 3kg Red Clover (AberClaret)

Image removed.

Table 2. Plot B - Aber HSG1

Image removed.
Download document: 67.69 KB, PDF

This file may not be fully accessible.


Business Wales Helpline

03456 000 813

Lines are open 10am to 4pm Monday to Friday.

Rydym yn croesawu galwadau'n Gymraeg.