BETA

You're viewing an updated version of this site - your feedback will help us to improve it.

report, Document

Brynllech Project Update - July 2024

Brynllech Uchaf

First published: 24 March 2026
Last updated: 24 March 2026
Download document: 86.15 KB, PDF

This file may not be fully accessible.

Due to a prolonged dry spell immediately following drilling, followed by a cold and wet Autumn and Winter, all three plots struggled to establish, leading to Rhodri to re-sow in April 2024 following the following method:

  1. Having to use a tine harrow to remove moss build up and crate disturbed soil for good soil to seed contact
  2. Broadcast seed at recommended rate
  3. Roll with grassland roller to consolidate

Good grass growth conditions followed in June 2024, ensuring good establishment.

The first cut and weigh analysis of Dry Matter grown on each plot was carried out on the 28th of June 2024. Average results can be seen below in Figure 4

Image removed.

Figure 4. Graph showing amount (in kgDM/ha) of available DM grown between 29 May and 28 June and corresponding grass growth rate (in kgDM/ha/day)

Find out more on this topic: 
Alternative forage systems for marginal land 

Download document: 86.15 KB, PDF

This file may not be fully accessible.


Business Wales Helpline

03456 000 813

Lines are open 10am to 4pm Monday to Friday.

Rydym yn croesawu galwadau'n Gymraeg.