BETA

You're viewing an updated version of this site - your feedback will help us to improve it.

report, Document

Tanygraig Project update - May 2024

Tanygraig Project update - May 2024

First published: 23 March 2026
Last updated: 23 March 2026
Download document: 585.25 KB, PDF

This file may not be fully accessible.

Project 2: Incorporating red clover and seaweed biostimulant to improve forage quality and soil health

Three fields have been selected for the trial at Tanygraig; Cae Poni (0.81ha), Cae Plow (0.87ha) and Cae Banc (1.02ha); all fields have had similar past management and are shown in Figure 1.

Image removed.

Figure 1. Map of fields at Tanygraig 

All red clover plots were overseeded on 22nd of April 2024.  Below are the details of the different establishing methods used in the trial:  

a. Opico 
b. Direct drilled

Image removed.

 

Image removed.
Download document: 585.25 KB, PDF

This file may not be fully accessible.


Business Wales Helpline

03456 000 813

Lines are open 10am to 4pm Monday to Friday.

Rydym yn croesawu galwadau'n Gymraeg.